One of Nepal’s largest hydropower projects, in steep and highly seismic terrain. Above the take-off yard at Gongar, GSI designed, supplied and built a flexible rockfall barrier system as part of the slope stabilization works, protecting the installation and its personnel.
Rockfall protection · EPC · Dolakha
Upper Tamakoshi Hydropower Project
Flexible rockfall barrier above the take-off yard at Gongar, protecting one of Nepal's largest hydropower projects.


- Client
- Upper Tamakoshi Hydropower Ltd.
- Location
- Gongar, Dolakha
- Scope
- Design, supply and construction
- System
- Flexible rockfall barrier