Upper Tamakoshi Hydropower Project

Flexible rockfall barrier above the take-off yard at Gongar, protecting one of Nepal's largest hydropower projects.

Flexible rockfall barrier above the take-off yard at Gongar
Flexible barrier above the take-off yard, Gongar
GSI crew fixing ring-net panels to the Tamakoshi barrier
Ring-net installation

One of Nepal’s largest hydropower projects, in steep and highly seismic terrain. Above the take-off yard at Gongar, GSI designed, supplied and built a flexible rockfall barrier system as part of the slope stabilization works, protecting the installation and its personnel.

Client
Upper Tamakoshi Hydropower Ltd.
Location
Gongar, Dolakha
Scope
Design, supply and construction
System
Flexible rockfall barrier